Private label Stick packs
Private label stick packs
Private label stick packs from BioGalen Nutra are single serve drink mixes, filled and sealed in our own plant in Bavla, Gujarat, India, at 2 to 12 g per stick. Runs start from 12,000 sticks and scale to 1 million units a month, and every lot is tested by an independent ISO 17025 lab before it ships.
The range covers what sells in sticks: electrolytes and hydration, creatine, collagen, greens and reds, energy and focus, sleep and calm, and gut health. Each formula can change its flavour, sweetener, stick count and carton, and most take small dose changes. Sticks are filled in a laminated film with a moisture barrier, sealed on three sides with a tear notch, and packed into printed cartons. Your landed price, with freight, US duty and delivery to your 3PL or Amazon, comes in writing within 24 to 48 hours.
- Three-side seal
- Tear notch
- 10 to 30 per carton
- Printed cartons

Showing 5 formulas.

Stick packs
Collagen Beauty Stick Packs
With vitamin C, biotin, hyaluronic acid
BGN-STK-029

Stick packs
Collagen Peptide Stick Packs
Unflavoured
BGN-STK-003

Stick packs
Electrolyte and Immune Stick Packs
With vitamin C and zinc
BGN-STK-027

Stick packs
Immune Stick Packs
Vitamin C, zinc, elderberry
BGN-STK-009

Stick packs
Vitamin C Stick Packs
1,000 mg
BGN-STK-024
Questions buyers ask
How much powder fits in one stick pack?
Fill weights run 2 to 12 g per stick, which covers a single serving of most drink mixes, from a 3 g electrolyte to a 10 g collagen.
How many sticks go in a carton?
Most brands choose 10, 14, 15, 20 or 30 sticks per printed carton. The count is your choice and does not change the formula.
Can I change the flavour or sweetener?
Yes. Flavour, sweetener, stick count and carton can change on any stock formula, and small dose changes are possible too.
How long does a stick pack order take?
Production takes about 4 weeks from artwork approval. By air, delivery to the US takes about 1 to 2 weeks door to door, and by sea about 5 to 7 weeks door to door. Your production start date is confirmed in your written quote.